Tag Archives: boat repairs

Hauling out at Norsand Boatyard

A return to New Zealand means a return to the boatyard.  We have a lot of upgrades, repairs, and general maintenance to do at Norsand Boatyard.

The slipway team with Kevin and Shane handle our haul out with expertise and professionalism!

We arrived in NZ with an exceptionally clean bottom (hull) when we arrived 18 days ago.  However, we spent those 18 days up river tied to a dock with warm, stagnant water.  These conditions are perfect for growing barnacles on our nice clean boat.

The good news: the yard pressure washed the boat immediately after haul out.  Matt and I (mostly Matt) spent days scraping the barnacle feet off the hulls so we could see where we needed to touch up the Coppercoat.   We do plan to burnish the bottom before we splash.

We have so many projects to accomplish in a short amount of time.  We have had to hire several different contractors in addition to the experts at Norsand.

Contractor Projects

  • Repair: Port fresh water tank needs to be repainted
  • Repair: Bottom of hull needs to be repaired due to reef scratches
  • Repair: Port rudder arm attachment needs to be replaced
  • Repair Canvas: Genoa bolt rope, aft shade, dinghy chaps, helm seat, 2-window shades, 3-back rests
  • Maintenance: Saildrives need to be serviced, gear oil changed, seals near props changed
  • Maintenance: Props need to be services, cleaned, and slightly adjusted
  • Maintenance: Paint crossbeam and martingale
  • Maintenance: Re-varnish (2) princess seats, (2) handrails, (4) swim steps
  • Maintenance: Burnish bottom of the boat
  • Maintenance: Paint saildrives and props with Prop Speed
  • Maintenance: Apply vinyl to rudder entry 
  • Upgrade: New window covers
  • Upgrade: New Solar Arch
  • Upgrade: New Solar Panels
  • Upgrade: New (2) Air Conditioning units
  • Upgrade: New Helm station extensions to fit new chart plotters
  • Upgrade: New Raymarine Mounts to fit gauge on helm
  • Upgrade: New rain flashing for the 4 large windows

Matt and Christine’s Projects

  • Paint (2) bow peak lockers (scrape, sand, clean, paint)
  • Clean stainless chain and re-mark 10m sections
  • Replace large zincs
  • Add freon to refrigerator and defrost freezer
  • Deep clean oven and stove
  • Paint security camera and cockpit clutch
  • Replace stickers on daggerboards
  • Sew: New helm covers, rail protectors, princess seat covers, cover for backrest
  • Polish all exterior and interior stainless
  • Clean and oil all exterior (hatch covers, sugar scoops) and interior (floors, walls, cabinets, tables) teak
  • Deep clean or re-organize entire boat
  • Prepare for insurance survey

The Plan

Our goal is to be out of the yard in 45 days but more likely it will be 90 days.  However, Norsand will close the yard for nearly 3 weeks during our haul out. 

Matt and I will focus on the contractor work for the first 5 weeks. We will work on our smaller projects in between our project management and overseeing of projects.

When Norsand closes we will focus on our larger projects.

We worked in the Norsand boatyard from 10 November 2025 – 12 January 2026.

Find Norsand Boatyard on No Foreign Land.

Check out the quirky things to do in Whangarei.

Cracked Neck & Rusty Elbow: Engine Repairs

Sugar Shack has been an incredibly trustworthy yacht and home.  Since we bought her in 2010, she has never failed us, she has delivered us across the Atlantic and Pacific Oceans putting well over 40,000nm under her keel.  Besides general maintenance, we have not had to do a major overhaul.  Until now….the boat repairs and projects have been piling up, but we could not get to most of them because we either did not have the resources or the expertise. 

Arriving in New Zealand has been a blessing in that we now have access to both the resources and expertise to get many of these repairs done.  Most we will do ourselves (or shall I say, Matt will do himself), but some we are hiring contractors to help us out.

Busy Work:

The starboard engine needed some serious love.  The coolant neck is cracked.  Matt had been gluing the coolant neck onto the coolant manifold but it really needed to be re-braised (type of welding).  The problem is the entire manifold had to come off in order to get the part to the welder (Absolute Stainless).  And this piece has not been removed in the boat’s life (22 years and counting).  So, Matt had to finagle the bolts using a new ¾” impact hammer.

He finally removed the piece after using much elbow grease.  One of the owners offered to come pick it up, but Matt had to carry the beast a few hundred yards to the parking lot.

They were able to fit us in right away, despite the shop being incredibly busy and way backlogged.  He contacted us the next day and said that he was able to braise the coolant neck with no problem.  Top left is the glued coolant neck and the other three show it re-braised properly.

1 Problem Solved: 1 Problem Discovered:

Slight problem – when Simon at Absolute Stainless was cleaning up the rusty exhaust elbow on the manifold, it started to crumble.  Well $hit!

We contacted the Volvo dealer (as this is a Volvo part) and they informed us that the part is not available in NZ and it would take several months to get it.  Considering we can’t use the engine without this part, we opted to ship this part in at a whopping $250USD shipping.  But we got it within 2 weeks!

Engine Cleanup

In the meantime, Matt replaced several raw water hoses that were looking ratty and difficult to see through.

Once we got the exhaust elbow back on the manifold, he installed it back on the engine. 

Next, the alternator bracket.  He had to take this off because it had a crack in it and needed to be welded back together.  You can see that we have welded this piece several times.  The alternator is very, very heavy and when under load while under passage it tends to put a lot of pressure on this huge piece of stainless steel.  The blue arrows indicate new weld.

Matt took advantage of the situation since the engine was really accessible and torn apart.  he cleaned up all around the engine, painted special rust repellent then volvo green paint on the engine.

The starboard engine after a very long spa treatment.

A Few Other Odd Jobs

  • Replaced fuel tank caps, gasket and lid (port/starboard)
  • Sewed new fender covers for our large A4 fenders (old blue cover, lower left corner, new black covers)

  • Received new Highfield 360 PVC Dinghy. Our sailmaker took us to collect our new dinghy from All Marine. He will graciously store it for us at his barn until the canvas lady can make her dinghy chaps.  Talk about great service!

The events from this blog occurred in early December.  We find fabulous hiking trails in Whangarei in our last blog post.