Solar Arch Installation

After months of planning, two test fits, and countless discussions, we were ready to install our new solar arch.

Be sure to read Part I “Solar Arch Design & Fitting” before you read this blog post.

After our fitting, Phil, our stainless fabricator, took our partially made arch back to his workshop.  He had another 2 weeks of work to do including:

  • installing the “ladders” on both sides of the arch
  • connecting the truss to the arch
  • adding support tubes
  • making all of the access points for our lights, antennae’s, and equipment
  • create the mounting brackets

Once he was done with his work, Phil will sanded and polished the entire piece.

Shine Like a Diamond

The next step was electro polishing at Spiraweld in Auckland.  This was tricky as the arch is so large it makes driving long distances at fast speeds difficult.

What is electropolishing?

It is an electrochemical process that removes small peaks and burrs from the surface of the metal part generally improving its smoothness and giving it a shiny appearance. The process is a form of electrolysis, the acid electrolyte acting as a conduit which removes metal ions from the surface of the stainless steel part.

Electropolishing will enhance corrosion resistance and will make it look bright, shiny and ultraclean.  It will also prevent corrosion which will reduce our cleaning.

The Damage

Spiraweld had asked us to cut the arch in half to prevent damage to it.  We knew this might be a possibility but we had really hoped they could dip it as one piece. 

Phil, our fabricator was there and cut it in half to make it easier to dip in the bins.  So imagine our surprise when we got a call that the arch was dropped and damaged!

Evidently, the leg of the arch hit the side of the bin in multiple places. For F@CK sake!  We had been so careful for the past few months in transport.

I know it does not look like much the tube is 75 mil in diameter and 1.6mm thick.  It is big, but light.  Dents like this will compromise the strength of the leg and cannot just be bumped out and polished.

Phil ended up cutting it off and sleeved it to make it stronger than the original.  Seriously more time, more money. Unfortunately, we will always be able to see the “wave” in the stainless.  It is impossible to get it out completely without completely redoing the entire leg.

To add insult to injury, we had another problem.  Phil accidentally shattered the bottom part of one panel when he was attaching it to its plate.  This has not been a good few days for us.

INSTALLATION DAY

The BIG day has arrived!  We were super anxious for today after 4 missed installation dates and all of the damage.  Phil arrived at 5:15am and we got to work.  We had to drill holes on two of the four remaining panels.  Great way to amp up the stress levels as you put a drill close to your brand new glass solar panels!

Next we began running mouse lines to help get some of the wires through.  It is super tricky to run the lines as there are 90 degree turns and false holes to avoid.

Culham Engineering sent the crane promptly at 0800.  By 8:20am we had our baby flying above the masts. 

We have two people on each side with lines controlling the movement as the crane lifts it above our mast and behind our boat.

We use a ratchet line to pull the arch together (side to side).  We test fit it first, mark the boat, pull the arch back and start drilling holes.

It is horrible to watch someone drill holes into your boat – but what can you do?

Conclusion

Nobody got hurt, the boat was not damaged and the arch is somewhat installed.  Good.

It took 3.5 hours with the crane and an additional 2 hours with Phil.  We had the bolts in but were waiting for proper backing plates to permanently secure the bolts.

Issue:  We thought the front legs would bolt into the engine compartments (behind the bulk head).  But to our surprise the bolts split the bulk head.  So, one bolt was inside the engine room and the other bolt was on the other side of the bulk head.  The only way to reach that bolt is to remove the ceiling panels from the master cabin and office.  

Yet, another project.  

It took us 4 additional days to fabricate new backing plates, get new (shorter) bolts for the ones in front of the bulk head, make 2 new vertical legs (for additional support), and use sika flex to secure everything together.

We still have the ratchet lines and our topping lift attached to the arch to secure it.  These remained in place until everything we properly assembled.

It took us an additional 2 weeks to complete the arch.  We had hire a scissor lift to finish running all of the wires and install of the additional equipment.

The solar arch installed while at anchor.

Matt designed it so well.  He followed the same lines of the bimini legs and the same curve of the bimini to make them two mimic eachother.

Contacts

Stainless Fabricator: Phil Waddell hardout98@icloud.com and his wife Joy Waddell joyw2@icloud.com. 

Phil is NOT interested in building another solar arch like ours (it was too big).  However, he is open to smaller arches and other stainless fabrication.

Our blog posts run 8-10 weeks behind actual live events. 

Check out our last blog post on the solar arch design and fitting.

We started working with Phil in early November and had the fitting on 16 December 2025.

Tearing the Boat Apart

It is never easy tearing the boat apart. Matt and I have to create complete chaos in our home in order to complete our vast number of projects.

We disrupted every space and turned the entire boat upside down. Nothing was left untouched.

It made living on the boat very challenging (yes, we lived on the boat for over 3 months in this chaotic state).  Especially difficult for my OCD and neat freak character.

The cockpit becomes the work bench, storage area, and new galley.

The Salon

We upturned the salon several times. We emptied all of the contents under the settee into the two bathrooms (heads) and port aft cabin.  

All cables and wires are run through this area, which we can access only after removing everything.

Owners Cabin

We repainted the starboard potable water tank, which required taping everything off for weeks. No more access to our clothing, toiletries, or bed.

We dismantled the starboard cabin to allow workers access to install the new air-conditioning unit.

Starboard Bathroom

The owners bathroom was now a dedicated storage area for displaced items. We now stored items from the bilges, cabinets, and items from under the settee here.

Port Cabins

The forward cabin was now where Matt and I slept.  We stored our settee cushions here while work was being done in the main salon.

I packed the aft cabin with tools, parts, and projects waiting for Matt’s attention.

Port Bathroom

Stuff, junk, pots, pans, and more filled the port bathroom from floor to ceiling.

We stripped down and modified both helms.

We tore up the bow and bow peaks and rebuilt them several times as different projects progressed.

This is a shot of the bow while we were painting our cross beam.

Under the Boat

Under the boat is usually a storage area for yard tools, paint cans, and random projects outside.  We store our dinghy under the boat, park the car under the boat, and generally complete projects.

We were “on the hard” at Norsand Boatyard from early November 2025 to February 2026.

Get ready as you are about to read all about the projects that caused such chaos onboard Sugar Shack.

Don’t miss our last beautiful post on Whangarei Waterfalls.

Hauling out at Norsand Boatyard

A return to New Zealand means a return to the boatyard.  We have a lot of upgrades, repairs, and general maintenance to do at Norsand Boatyard.

The slipway team with Kevin and Shane handle our haul out with expertise and professionalism!

We arrived in NZ with an exceptionally clean bottom (hull) when we arrived 18 days ago.  However, we spent those 18 days up river tied to a dock with warm, stagnant water.  These conditions are perfect for growing barnacles on our nice clean boat.

The good news: the yard pressure washed the boat immediately after haul out.  Matt and I (mostly Matt) spent days scraping the barnacle feet off the hulls so we could see where we needed to touch up the Coppercoat.   We do plan to burnish the bottom before we splash.

We have so many projects to accomplish in a short amount of time.  We have had to hire several different contractors in addition to the experts at Norsand.

Contractor Projects

  • Repair: Port fresh water tank needs to be repainted
  • Repair: Bottom of hull needs to be repaired due to reef scratches
  • Repair: Port rudder arm attachment needs to be replaced
  • Repair Canvas: Genoa bolt rope, aft shade, dinghy chaps, helm seat, 2-window shades, 3-back rests
  • Maintenance: Saildrives need to be serviced, gear oil changed, seals near props changed
  • Maintenance: Props need to be services, cleaned, and slightly adjusted
  • Maintenance: Paint crossbeam and martingale
  • Maintenance: Re-varnish (2) princess seats, (2) handrails, (4) swim steps
  • Maintenance: Burnish bottom of the boat
  • Maintenance: Paint saildrives and props with Prop Speed
  • Maintenance: Apply vinyl to rudder entry 
  • Upgrade: New window covers
  • Upgrade: New Solar Arch
  • Upgrade: New Solar Panels
  • Upgrade: New (2) Air Conditioning units
  • Upgrade: New Helm station extensions to fit new chart plotters
  • Upgrade: New Raymarine Mounts to fit gauge on helm
  • Upgrade: New rain flashing for the 4 large windows

Matt and Christine’s Projects

  • Paint (2) bow peak lockers (scrape, sand, clean, paint)
  • Clean stainless chain and re-mark 10m sections
  • Replace large zincs
  • Add freon to refrigerator and defrost freezer
  • Deep clean oven and stove
  • Paint security camera and cockpit clutch
  • Replace stickers on daggerboards
  • Sew: New helm covers, rail protectors, princess seat covers, cover for backrest
  • Polish all exterior and interior stainless
  • Clean and oil all exterior (hatch covers, sugar scoops) and interior (floors, walls, cabinets, tables) teak
  • Deep clean or re-organize entire boat
  • Prepare for insurance survey

The Plan

Our goal is to be out of the yard in 45 days but more likely it will be 90 days.  However, Norsand will close the yard for nearly 3 weeks during our haul out. 

Matt and I will focus on the contractor work for the first 5 weeks. We will work on our smaller projects in between our project management and overseeing of projects.

When Norsand closes we will focus on our larger projects.

We worked in the Norsand boatyard from 10 November 2025 – 12 January 2026.

Find Norsand Boatyard on No Foreign Land.

Check out the quirky things to do in Whangarei.