Tag Archives: solar arch

Solar Arch: Added Equipment Benefits

Since we were putting a monstrosity on the back of our boat we decided to add a few more upgrades.  We added several new pieces of equipment and moved other equipment on to the arch rails.

  • Nemesis Gauge
  • (2) Security Cameras
  • Courtesy (Deck) Light
  • Navigation Stern Light
  • Starlink
  • IridiumGo Antennae
  • Fishing Rod Holders

Most of the items can easily be accessed by climbing the rails on the side of the arch.  

However, Matt had to use a scissor lift to reach the center of the arch.  The center is 8 meters off the ground.

The center of the arch is the entry point for the solar panels, 2 lights, and Nemesis wires.  Once the cables were wired we installed the equipment.

We had a friend come over to assist and learn how to wire the solar panels.  

Matt was on the scissor lift while Mick was in the engine room.

Nemesis Navigation Gauge

For years we have wanted a forward facing gauge in the cockpit.  However, it has always been one of those “nice to have” things.  

We often sit in the cockpit facing aft (behind the boat) when we are not at the helm.  It is shaded and comfortable.  However, from this position you cannot see any of the gauges.  You have to turn around and lean forward.  Not terrible, but not convenient.

Now that we have the new arch we have a place to mount a new gauge.  Matt selected the 9″ B&G Nemesis which can be mounted vertical or horizontal.

Matthew Duckett (Cleigh Ltd) purchased the Nemesis from Navico for about $1400 which is a huge savings!

Matt had pre-installed the Nemesis to the stainless frame as it required very, very small screws, washers, and bolts.  Unfortunately, we realized it was upside down after it was installed!  

We disconnected the panel, took the entire unit off, turned it right side up and reinstalled everything.  

Security Cameras

We purchased (2) Reolink outdoor surveillance cameras that have motion detection, night vision and two way talk mode.

Purchased from Amazon for $129 USD each.  

These cameras are in addition to the security camera we have in the cockpit.  We are well protected.

Aft Lights 

Courtesy Deck Light (NARVA LED Blue /White Deck Light – Black 72443B) was purchased at All Marine for $87. 

The cool feature about this courtesy light is that it can either be white or blue.

We also moved our stern navigation light to the back of the arch.

Existing Equipment

We moved several pieces of equipment that were located on the stern of the boat to the arch. 

Matt moved Starlink from the port dinghy davit to the port side of the arch. 

The IridiumGo antennae was located at the starboard helm and frankly in the way.

And just because we could, we added a few more fishing rod holders.

Our blog posts run 6-8 weeks behind actual live events.  

We installed the above equipment in January 2026.

Of course the main purpose of the arch is to hold our 4 new solar panels.  You can read about these new panels in “Power Up: New Solar Panels” blog post.

Power Up: New Solar Panels

After living on the boat, full time, for the past 9 years we have decided we “need” (aka “want”) more solar power.  Currently we have 1200 watts of solar panels coming from (8) Solara Ultra 150 panels.  This solar power gets us through perfectly well on sunny days. 

However, if we have a 3+ cloudy days we end up having to run our portable Honda EU32IU Generator.

Our goal is to have enough solar to get us through 6-7 cloudy days.  In addition, more solar will allow us to run our additional Engle (portable freezer), Starlink 24/7, and our new aircon.

Extra solar will allow us to have a lot more electrical and power freedom.

New Solar Panels

We ordered (4) Sun Power P7 – 455W bifacial panels from Hubands Energy.  These 4 new panels will provide us with an additional 1800 wats (total of 3,000 wats combined with our original panels). Technically, the new solar panels could potentially generate 2,184 as they are bifacial capturing the sun from the water’s reflection.

We paid about $150 USD per panel including GST and delivery.

The problem is that we have nowhere to put additional panels without building a solar arch. 

The only place for this arch is on the aft of the boat over the davits.

Be sure to read our next blog post on the building of our solar arch.

Install

We had to drill holes into the solar panel frames to fit them onto their custom designed brackets.  Always nerve racking when you put a drill close to your glass panels.

No issues with the drilling so we moved on to the wiring.

We run “mouse lines” through the arch to make it easier to run the thicker cables once the arch is up.

Next up we install each panel while it is on the ground and easier to access.

The new panels are embedded between the bars so there is no overhang.  We wanted it to look super clean from all sides.

We are very happy with the final look.

Contacts

  • Stainless Fabricator: Phil Waddell hardout98@icloud.com and his wife Joy Waddell joyw2@icloud.com
  • Hopewell: http://hopewellchina.en.alibaba.com/, Fanny Zhu: hehebiz@163.com
  • Cleigh Ltd Matthew Duckett, New Zealand, +64 21 890 697, matthew.duckett@cleagh.com 
  • Hubands, https://hubands.co.nz, Travis travis@hubands.co.nz 

Our blog posts run 6-8 weeks behind actual live events. 

We worked on these upgrades at Norsand Boatyard in Whangarei, New Zealand.

Be sure to check out our post on the new solar arch installation.

Solar Arch Installation

After months of planning, two test fits, and countless discussions, we were ready to install our new solar arch.

Be sure to read Part I “Solar Arch Design & Fitting” before you read this blog post.

After our fitting, Phil, our stainless fabricator, took our partially made arch back to his workshop.  He had another 2 weeks of work to do including:

  • installing the “ladders” on both sides of the arch
  • connecting the truss to the arch
  • adding support tubes
  • making all of the access points for our lights, antennae’s, and equipment
  • create the mounting brackets

Once he was done with his work, Phil will sanded and polished the entire piece.

Shine Like a Diamond

The next step was electro polishing at Spiraweld in Auckland.  This was tricky as the arch is so large it makes driving long distances at fast speeds difficult.

What is electropolishing?

It is an electrochemical process that removes small peaks and burrs from the surface of the metal part generally improving its smoothness and giving it a shiny appearance. The process is a form of electrolysis, the acid electrolyte acting as a conduit which removes metal ions from the surface of the stainless steel part.

Electropolishing will enhance corrosion resistance and will make it look bright, shiny and ultraclean.  It will also prevent corrosion which will reduce our cleaning.

The Damage

Spiraweld had asked us to cut the arch in half to prevent damage to it.  We knew this might be a possibility but we had really hoped they could dip it as one piece. 

Phil, our fabricator was there and cut it in half to make it easier to dip in the bins.  So imagine our surprise when we got a call that the arch was dropped and damaged!

Evidently, the leg of the arch hit the side of the bin in multiple places. For F@CK sake!  We had been so careful for the past few months in transport.

I know it does not look like much the tube is 75 mil in diameter and 1.6mm thick.  It is big, but light.  Dents like this will compromise the strength of the leg and cannot just be bumped out and polished.

Phil ended up cutting it off and sleeved it to make it stronger than the original.  Seriously more time, more money. Unfortunately, we will always be able to see the “wave” in the stainless.  It is impossible to get it out completely without completely redoing the entire leg.

To add insult to injury, we had another problem.  Phil accidentally shattered the bottom part of one panel when he was attaching it to its plate.  This has not been a good few days for us.

INSTALLATION DAY

The BIG day has arrived!  We were super anxious for today after 4 missed installation dates and all of the damage.  Phil arrived at 5:15am and we got to work.  We had to drill holes on two of the four remaining panels.  Great way to amp up the stress levels as you put a drill close to your brand new glass solar panels!

Next we began running mouse lines to help get some of the wires through.  It is super tricky to run the lines as there are 90 degree turns and false holes to avoid.

Culham Engineering sent the crane promptly at 0800.  By 8:20am we had our baby flying above the masts. 

We have two people on each side with lines controlling the movement as the crane lifts it above our mast and behind our boat.

We use a ratchet line to pull the arch together (side to side).  We test fit it first, mark the boat, pull the arch back and start drilling holes.

It is horrible to watch someone drill holes into your boat – but what can you do?

Conclusion

Nobody got hurt, the boat was not damaged and the arch is somewhat installed.  Good.

It took 3.5 hours with the crane and an additional 2 hours with Phil.  We had the bolts in but were waiting for proper backing plates to permanently secure the bolts.

Issue:  We thought the front legs would bolt into the engine compartments (behind the bulk head).  But to our surprise the bolts split the bulk head.  So, one bolt was inside the engine room and the other bolt was on the other side of the bulk head.  The only way to reach that bolt is to remove the ceiling panels from the master cabin and office.  

Yet, another project.  

It took us 4 additional days to fabricate new backing plates, get new (shorter) bolts for the ones in front of the bulk head, make 2 new vertical legs (for additional support), and use sika flex to secure everything together.

We still have the ratchet lines and our topping lift attached to the arch to secure it.  These remained in place until everything we properly assembled.

It took us an additional 2 weeks to complete the arch.  We had hire a scissor lift to finish running all of the wires and install of the additional equipment.

The solar arch installed while at anchor.

Matt designed it so well.  He followed the same lines of the bimini legs and the same curve of the bimini to make them two mimic eachother.

Contacts

Stainless Fabricator: Phil Waddell hardout98@icloud.com and his wife Joy Waddell joyw2@icloud.com. 

Phil is NOT interested in building another solar arch like ours (it was too big).  However, he is open to smaller arches and other stainless fabrication.

Our blog posts run 8-10 weeks behind actual live events. 

Check out our last blog post on the solar arch design and fitting.

We started working with Phil in early November and had the fitting on 16 December 2025.